| General Specs |
General Overview |
| • 1 - 3 Million BTU
• Oil, Nautral Gas, or Combination Burners Available
• High Efficiency Three-Pass Coil Design
• Built to Section IV of ASME Code
• Registered with the National Board of Boiler and Pressure
Vessel Inspectors |
Designed for the Pre-Cast and Ready-Mixed concrete industries. Hot water is available within minutes of startup. Units can be run continuously. No preheating and no recovery time is needed. Units are modular so you can make a minimal investment to start, and expand your system as your operation grows. Installation is easy. Just connect the water heater to the required utilities and you are ready to operate the unit. Quality since 1939!
|